history

see where we’ve been and where we’re going

雪佛龙公司自1952年以来一直在澳大利亚运营when they entered Western Australia through the purchase of Caltex. A year later, oil was discovered at Rough Range – Australia’s first commercial well. More recently, Chevron has brought online two world-class LNG facilities – Gorgon and Wheatstone. Here are some of the milestones that happened along the way.

A charter flight from Rough Range, the first working well of Australia's commercial petroleum industry.

Oil found in WA press clipping.

1952| Chevron enters Western Australia through Caltex (owned by Texaco and Standard Oil of California later to become Chevron) joining with Ampol Petroleum to form West Australian Petroleum (WAPET). Just over a year later, WAPET found oil at the Rough Range No.1 well in the Carnarvon Basin.

1964 |Chevron joined Woodside and Shell in an exploration joint venture which later became theNorth West Shelf Project. Later that year, WAPET announced an oil discovery onBarrow Islandas first oil flowed from Barrow No.1.

1966| WAPET found gas at Dongara in the Perth Basin. In 1967 the naturalistHarry Butlerwas appointed as a conservation consultant to WAPET in a pioneering move to support environmental management at Barrow Island. The first shipment of oil also left Barrow Island that year.

Unloading supplies on Barrow Island.

1967| First shipment of oil leaves Barrow Island. Naturalist Harry Butler appointed conservation consultant to WAPET in a pioneering move to protect the environment at Barrow Island.

First shipment of oil from Barrow Island.
Unloading supplies on Barrow Island.

1973| The West Tryal Rocks gas field was discovered north-west of Barrow Island in 1973, the first of the Greater Gorgon Area gas fields to be discovered. In 1980 the Gorgon field was discovered in deep water west of Barrow Island.

1984| First gas was delivered from the North West Shelf Project to Perth via the Dampier to Bunbury Natural Gas Pipeline. Five years later, the first LNG shipment was exported from the Venture to Japan.

Unloading supplies on Barrow Island.

From 1994 to 2000, a series of new gas discoveries were made in the Greater Gorgon Area. Also in 2000, Chevron Australia became operator of the oil and gas exploration and production assets previously managed by WAPET.

After extensive studies to identify the best site for the Gorgon Project, the Western Australian Government provided in-principle approval for the Gorgon Project’s onshore gas plant to be based at Barrow Island in 2003. The Wheatstone gas field was discovered in the Greater Gorgon Area in 2004.

Further gas discoveries were made in the area in 2006. The Western Australian and Federal Governments awarded environmental approvals for a 10 million tonne per annum (mtpa) LNG plant and domestic gas plant at Barrow Island in 2007.

In 2008 Chevron announced that it was working with government to secure approvals for a revised and expanded 15 mtpa Gorgon Project.

The first shipment of LNG from the Gorgon Project departs Barrow Island.

2009| The Gorgon Project receives final environmental approvals from the WA State and Federal governments and reaches a final investment decision. Construction on the Gorgon Project commences on Barrow Island.

The Wheatstone platform site approximately 220km offshore, north west of Onslow.

2011| The Wheatstone Project received final environmental approval from the WA and Federal Government prior to reaching a final investment decision (FID) on 26 September 2011. Construction began on site in Ashburton North in December 2011.

2014| Construction continues simultaneously on both the Gorgon and Wheatstone projects as they progress closer to completion.

Construction continues simultaneously on both the Gorgon and Wheatstone projects as they progress closer to completion.

2016| On 7 March 2016 Chevron announced it has started producing liquefied natural gas (LNG) and condensate at the Gorgon Project on Barrow Island off the northwest coast of Western Australia. Domestic gas supply to the Western Australian market commenced in December 2016.

2017| On 17 October 2017 production of LNG starts at the Wheatstone Project in Western Australia. On 31 October 2017 the first shipment of LNG from the Wheatstone Project, 12kms west of Onslow, departed to one Chevron’s foundation buyers, JERA for delivery into Japan.

2019| On 5 March 2019 domestic gas supply to the Western Australian market commenced from the Wheatstone Project.

The first shipment of LNG from the Gorgon Project departs Barrow Island.

2016| On 2 June 2016 Chevron Australia along with the Western Australian State Government announces the new Chevron Parkland located within the Optus Stadium Sports Precinct on the Burswood Peninsula.

2017| Chevron Australia announced the Harry Butler Legacy Project, dedicated to upholding the late Dr Harry Butler’s AO CBE passion and unwavering commitment to conservation and the environment for the benefit of future generations. Harry Butler’s relationship with Chevron spanned more than 50 years where he had a particular impact with his conservation work on Barrow Island, a Class A Nature Reserve and home to the Chevron-led Gorgon Project and WA Oil.

The first shipment of LNG from the Gorgon Project departs Barrow Island.

2019| Chevron Australia begins operation of the carbon dioxide injection system at the Chevron-led Gorgon natural gas facility on Barrow Island, off the northwest coast of Western Australia. The carbon dioxide injection facility will reduce Gorgon’s greenhouse gas emissions by about 40 percent, or more than 100 million tonnes over the life of the injection project.

Chevron Australia personnel at the Chevron-operated Gorgon carbon dioxide injection facility on Barrow Island.